Profex Gevelbekleding Wit

Installation manual wall cladding

Navigate to next module

Installation manual Pofex wall cladding

 

Important:

  • Store panels flat, dry and covered (not in direct sunlight).
  • Always check the materials for any defects before processing them.
  • Half-fasten the panels with Profex screws to allow for movement.
  • 10 mm dilatation joints (expansion gap) between the top sides of the panels and all auxiliary profiles.
  • Heated air behind the panels must be able to dissipate above and below through sufficient ventilation.

 

General:

  • Use a heated place to saw and work when working at temperatures under 5.°C.
  • Auxiliary profiles must be fastened with stainless steel staples, nails or screws.
  • Profex wall cladding can expand or shrink up to 2.5 mm per metre.

 

Framework (batten) and fastening:

  • Never close off a horizontal girder thickness of 20 to 28 mm between the girders!
  • Profex wall cladding should be installed at least 50 mm above ground level.
  • Fasten start profiles and ventilation profiles (pest repellent profiles) in such a way that the bottom panel has sufficient support.
  • First install the panel in the panel’s centre, inserting screws to the left and the right in the groove.
  • Then install the screws from the centre to the ends in the centre of the groove.
  • Ensure that any insulation and/or film present cannot bulge in such a way that would hinder ventilation.
  • Horizontal girders may not impede ventilation, which means that vertical girders must be installed first.

 

Maintenance:

  • Clean with a mild soap and water solution; never use solvents!